|

There's a lot of excitement in the Environmental
Industry about GeoprobeŽ Prepacked Well Screens designed for setting Small
Diameter Monitoring Wells. Prepacked screens consist of a standard, slotted
PVC well screen pipe surrounded by a stainless steel mesh. Sand is packed
between the slotted PVC and the stainless steel mesh. Since the sand is
packed around the slotted PVC before the well screen is installed, using
prepacks guarantees that sand will be located directly around the well
screen. This makes well installation quicker and more efficient than traditional
methods.
Prepacked well screens are available in the following sizes
- 2.0 in. ID x 3.4 in. OD
- 1.5 in. ID x 2.5 in. OD
- 1.0 in. ID x 2.5 in. OD
- 0.75 in. ID x 1.4 in. OD
- 0.5 in. ID x 1.4 in. OD
To install a monitoring well
with these
prepacks, probe rods are first driven to depth with a GeoprobeŽ probing machine. The well assembly is then lowered into the
probe rod string with threaded PVC riser pipe. The 3.4 in. OD prepacked well assembly uses 2.0-inch Schedule 40 PVC riser pipe and is installed with 4.25-inch OD probe rods or through hollow stem augers. The 2.5-inch OD prepack well assembly
uses 1.0-inch Schedule 40 PVC riser pipe and is installed with 3.25-inch
OD probe rods. The smaller diameter prepacked
well screen assembly uses 0.5-inch Schedule 80 PVC riser pipe and is installed
with 2.25-inch OD probe rods.
Once the well assembly is lowered to the
bottom of the probe rod string, the probe rods are retracted to a point
above the screen. A sand barrier, installed directly above the well screen,
prevents grout from entering the screens. This barrier can be created
either by natural formation collapse (occurring during the initial probe
rod retraction) or by gravity installation of fine-grade sand through
the rod annulus. With the barrier in place, granular bentonite or bentonite
slurry is then installed in the annulus to form a well seal.
GeoprobeŽ Small Diameter Monitoring Well
Benefits include:
- Quick and simple installation.
- Prepacked Screen designed with 20/40 grade
environmental sand.
- No cuttings generated during installation.

- Meets all requirements of a RCRA well
with exception of the smaller diameter.
- Permanent monitoring well installation
with a GeoprobeŽ Machine.
- Well seal and grouting meet EPA and ASTM
D-5092 method requirements.
- Minimal disturbance of natural formation
conditions.
- Can be developed, purged, and sampled
using inexpensive tubing check valve system.
- Minimal development and purge water generated
for sampling reducing time requirements and disposal costs.
- Uses standard above-ground or flush-mount
well protectors.
- Small diameter bladder pumps available
for 1.0-inch wells
PRODUCT
FEATURE
Tubing
Check Valves
Choose from a variety of sizes for your specific groundwater sampling
needs. Constructed of either stainless steel or PVC. The check valve is
fully captured in the body of the valve so you dont lose the ball!
Great for cleaning out and developing small-diameter direct push tools
and wells prior to either sampling or slug testing.
Tubing
Check Valves
GW4210 ... for 0.5 in. ID Tools
GW4220 ... for 0.75 in. ID Tools
GW4230 ... for 1.0 in. ID Tools
GW4240 ... for 0.25 in. ID Tools
|